January 11, 2023
My elevator was static balanced during construction along the hinge line. Once installed I found them to be tail heavy when all drive tubes were connected. I left the lead weight space accesible (removable foam + rib) in case I needed to add additional lead, just behind the original forward lead installed. A additional 2 pound of formed lead was added to each elevator tip and elevators are balanced up perfectly. The lead was floxed into place and a 1/4" rib was installed (floxed) along the aft edge of the new lead.
No comments:
Post a Comment