May and June not much to report. The Rudder and Elevator were installed on the airplane and all of the bolts and nuts of the proper sizes installed.
The tail wheel install was completed with all bolts-nuts and safety wired. I made up two interface stainless connector cables to tie in the tail wheel steering springs.
No comments:
Post a Comment