Fabricated two fuel lines from wing tanks to fuselage where they connect to the fuel valve, filter and fuel flow sensor.
-------------------------------------------------Experimental aircraft--------------------------------------------------------------------
Vision prototype photo
Wednesday, August 2, 2017
Saturday, September 26, 2009
Elevators, Ailerons and Flaps
Monday, July 20, 2009
Tuesday, December 30, 2008
Canopy, Box Spar and Wing construction.
Building the canopy and frame
Scratch building of the wing main "Box" spar.
Adding the interior ribs to the wing. The wing is built as any conventional style of wing with interior ribs, all foam parts as well as these ribs have fiberglass on each side of them.
Below are the forward "D" cells which will house the fuel. My fuel tanks are running the full length of the leading edge.
Below the top and bottom skins are starting to be installed. Each wing skin rests on a "L" shaped flange that runs around the perimeter of each bay, slightly recessed from the surface. This gives a protrusion of foam mon the outside surface that will be long board sanded down later.
Friday, December 12, 2008
Saturday, December 6, 2008
Thursday, March 12, 1998
Form building and initial layups
Building of the forms to support the foam sheeting.
Laying down the foam and covering with bid fiberglass.
Laying down the foam and covering with bid fiberglass.
Subscribe to:
Posts (Atom)